Slant/Fin SENTINEL SE-42 Installation And Operating Instructions Manual

Advertisement

GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASES
SENTINEL
HOT WATER MODELS SE-70 THROUGH SE-245
INSTALLATION AND OPERATING INSTRUCTIONS
CONTENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PAGE
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Boiler Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Chimney Requirements . . . . . . . . . . . . . . . . . . . . . . . . 4
Minimum Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Draft Hood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Vent Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Vent Damper Installation . . . . . . . . . . . . . . . . . . . . . . 5,6
Gas Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Electrical Controls and Wiring . . . . . . . . . . . . . . . . . . . 7
Boiler Water Temperature Control. . . . . . . . . . . . . 11-15
Sequence of Operation . . . . . . . . . . . . . . . . . . . . . . . 16
Water Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Filling and Venting Water Systems . . . . . . . . . . . . . . 17
General Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . 21
Water Level Check. . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Annual Inspection and Cleaning . . . . . . . . . . . . . . . . 22
Safety Check for Control Systems . . . . . . . . . . . . . . . 22
Keeping Area Clear . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Troubleshooting Guide . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Piping a Heating-Cooling System . . . . . . . . . . . . . . . . . . 24
Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Appendix A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Heating Contractor
Address
Phone Number
Printed in U.S.A. 0320
Part No. 46-0770
This manual must be left with
owner and should be hung on or
adjacent to the boiler for reference.
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS
AND STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS
WARNING
SEE "WARNING" ON PAGE 4 FOR LIQUEFIED
PETROLEUM (L.P.) PROPANE GAS-FIRED BOILERS
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such require-
ments, to the National Fuel Gas Code, ANSI Z223.1-lates
edition. The installation must also conform to the additional
requirements in this Slant/Fin Instruction Book.
In addition, where required by the authority having jurisdic-
tion, the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1. If there
is any conflict in the above requirements, then the more
stringent requirement will apply.
This manual must be left with owner and should be hung
on or adjacent to the boiler for reference.
WARNING
This boiler, gas piping and accessories must be installed,
connected, serviced and repaired by a trained, experienced
service technician, familiar with all precautions required for
gas-fired equipment and licensed otherwise qualified, in
compliance with the authority having jurisdiction.
Boiler Model Number
Boiler Serial Number
Installation Date
CANADIAN ENERGY
PERFORMANCE
VERIFIED
RENDEMENT
ENERGETIQUE
VERIFIE
Publication No. SE-42

Advertisement

Table of Contents
loading

Summary of Contents for Slant/Fin SENTINEL SE-42

  • Page 1: Table Of Contents

    Boiler Water Temperature Control... . . 11-15 requirements in this Slant/Fin Instruction Book. Sequence of Operation ..... . . 16 Boiler Room Air Supply and Ventilation .
  • Page 2: Dimensions

    Sentinel Dimensions MODEL SE-70 to SE-245 Dimensions Approx. (Inches) Total Wt. Boiler No. of Full of Model Sect. Water (lb.) SE-70 ⁄ " ⁄ " ⁄ " ⁄ " ⁄ " CHIMNEY RECOMMENDATIONS SE-105 ⁄ " ⁄ " ⁄ " ⁄...
  • Page 3: Installation Requirements

    Burners Pilot This installation must also conform to the additional requirements in this Slant/Fin Instruction Book. NATURAL GAS-FIRED BOILER LOCATION Provide a level, solid foundation for the boiler. Location should be as near as possible to chimney or outside wall so that the flue pipe from boiler is short and direct.
  • Page 4: Chimney Requirements

    Sentinel MINIMUM CLEARANCES FOR COMBUSTIBLE WARNING CONSTRUCTIONS SPECIAL ATTENTION FOR LIQUEFIED PETROLEUM  A. Minimum boiler clearances shall be as follows: (L.P.) PROPANE GAS-FIRED BOILER INSTALLATIONS B. Provide accessibility clearance of 24” on sides requiring servicing and 18” on sides used for passage. LPG appliances (boilers) shall be installed in accordance C.
  • Page 5: Vent Damper Installation

    Slant/Fin Corp. gas boiler models. These boilers must also be equipped with a label which states that the boiler must be used with a Slant/Fin Corp. automatic vent damper device and indicates the proper vent damper model number. * Install operator in any position as shown above. DO NOT install the operator A.
  • Page 6: Gas Piping

    Sentinel Example: Boiler model SE-175 is to be installed. Distance from WARNING—DANGER gas meter to the boiler is 20 ft. Heating value of natural gas is Once you have begun vent damper installation procedure, 1020 BTU/cu. ft. Select proper pipe size. DO NOT restore electric power and gas supply until installa- Gas flow = 175,000 BTU/hour = 171.5 cu.
  • Page 7: Electrical Controls And Wiring

    Sentinel ELECTRICAL WIRING anticipator at the value measured. The set current should DANGER: Before wiring, always turn off electric power supply, match power requirements by zone valves and relays. otherwise shock or death can result. Add an additional 0.1 Amp to the measured currrent for vent damper.
  • Page 8 Sentinel Figure 5. Multizoning of Sentinel boilers pump zoning system using R845A relay. Figure 6. Multizoning with indirect water heater pump zoning system using R882A/B relays.
  • Page 9 Sentinel Figure 7. Multizoning of Sentinel boilers zone valve system using V8043E/F zone valves. Figure 8. Multizoning, zone valve system with indirect water heater (DHW Priority) using R882A/B relay.
  • Page 10 Sentinel Figure 9. Single zone with indirect water heater (DHW Priority) using R882A/B relay.
  • Page 11: Boiler Water Temperature Control

    Sentinel BOILERS EQUIPPED WITH HYDROSTAT CONTROL SETTING THE CONTROL Diagnostic LEDs Test/Settings Jumper Button Dynamic Economy Dial NOTE: Settings can be checked Display (OFF or LO, 1, 2, 3, using the TEST/SETTINGS Button. 4, 5, HI) Water Temperature Factory 1 and Real Time Verification of Setting SETTING THE HIGH LIMIT Indicator Light Adjustments.
  • Page 12 Sentinel OPTIONAL FEATURES NOTE: The Program Mode – Pro – is accessed by turning the LO TEMP dial to a position just above OFF. THERMAL PRE-PURGE Thermal Pre-Purge is designed to maximize boiler efficiency. When activated, the control will supply latent heat that may remain in the boiler from a previous run cycle to the next heating zone that calls.
  • Page 13 Sentinel OPTIONAL FEATURES Continued CIRCULATOR ACTIVATION OPTIONS When in the default mode, the HydroStat activates the circulator (C1/C2 contacts) on calls to T/TV. The control can be pro- grammed to activate the circulator on calls to I1/I2 in place of, or in addition to, calls to T/TV. To change how the Circulator is activated 1.
  • Page 14 Sentinel OPTIONAL FEATURES Continued RESTORE FACTORY DEFAULT SETTINGS To restore all features to the factory default settings (see following chart for default settings) 1. Turn the LO TEMP dial to access the Program Mode – indicated in the display as Pro 2.
  • Page 15 Sentinel SYSTEM START-UP HOW THERMAL TARGETING WORKS At initial start up, with the Economy Feature active, the control Thermal Targeting technology analyzes thermostat activity and establishes a 145°F target temperature. To test the high limit continually evaluate how much heat the house requires. When shut-off function, the Economy Dial must be turned to OFF.
  • Page 16: Sequence Of Operation

    Sentinel SEQUENCE OF OPERATION FOR SENTINEL BOILERS THERMOSTAT CALLS FOR HEAT HIGH LIMIT CONTACTS CLOSED? CIRCULATOR ENERGIZED NO FURTHER LOW WATER CUT-OFF ACTION CONTACTS CLOSED? VENT DAMPER RELAY ENERGIZED. VENT DAMPER MOTOR OPENS VENT DAMPER. END SWITCH CLOSES. IGNITION CONTROL ENERGIZED SPARK GENERATOR MODULE POWERED.
  • Page 17: Boiler Room Air Supply And Ventilation

    Sentinel BOILER ROOM AIR SUPPLY AND VENTILATION An ample supply of air is required to obtain combustion and ventilation. ALL AIR COMES FROM OUTSIDE, directly through wall openings to the boiler or through unsealed open- ings around windows, doors, etc. in the whole building. When buildings are insulated, caulked and weather stripped, now or later on, direct openings to outside may be required and should be provided.
  • Page 18 Sentinel Figure 11. Zoning with circulators, optional indirect DHW tank...
  • Page 19 Sentinel Figure 12. Zoning with zone valves, optional indirect DHW tank...
  • Page 20: Initial Start, Safety And Lighting Instructions

    Sentinel SAFETY INFORMATION FOR YOUR SAFETY READ BEFORE OPERATING WARNING: If you do not follow these instructions exact- ly, a fire or explosion may result causing property dam- age, personal injury or loss of life. A. This appliance is equipped with an ignition device which automatically lights the pilot.
  • Page 21: Care And Maintenance

    4. The higher heating value* of gas varies substantially for b. To adjust pilot, turn pilot flow adjustment screw on different localities. Consult with Slant/Fin’s Technical valve clockwise or counterclockwise to give a steady Service Dept. for re-orificing procedures if any of the fol-...
  • Page 22: Water Level Check

    Sentinel E. BOILER ROOM AIR SUPPLY: check air vents for con- tinued POSITIVE supply of air as required. Air needs are greatest in cold weather. Air vents must be open and free of obstruction. F. WATER SYSTEM CHECK: 1. System to be full of water, and pressure to remain stable at correct setting on gauge.
  • Page 23: Troubleshooting Guide

    Sentinel GENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE BURNERS FAIL TO OPERATE CAUSE REMEDY 1. Safety pilot out, or flame too low. 1. Check, clean, re-light. See instructions. 2. Gas supply valve shut off. 2. Open gas valve(s). 3. Electric switch open. 3.
  • Page 24: Piping A Heating-Cooling System

    • Check the Molex plugs on both the control end and the damper end. • Check to be sure the vent damper motor turns. • Verify the vent damper end switch has closed. Call Slant/Fin Tech Support: The experts at Slant/Fin are ready to help. Call us at (800) 873-4346...
  • Page 25 IF REPLACEMENT PARTS ARE NEEDED parts should be identified by and ordered from Slant/Fin. Relief/Safety valves must be ASME rated for the pressure and When parts are needed, refer to boiler model and serial num- gross output of the boiler.
  • Page 26 Sentinel...
  • Page 27 Sentinel...
  • Page 28 ©Slant/Fin Corp. 2020 • Printed in the U.S.A. 0320 • Publication No. SE-42 P/N 46-0770 SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600 FAX: (516) 484-0933 • Canada: Slant/Fin , Mississauga, Ontario LTD/LTEE www.slantfin.com...

Table of Contents