Carrier 58ST Installation, Start-Up, Operating And Service And Maintenance Instructions page 23

Table of Contents

Advertisement

4. Remove and save two screws holding J- -Box. (See Fig.
23.)
5. Pull furnace power wires out of 1/2- -inch diameter hole in
J- -Box. Do not loosen wires from strain- -relief wire- -tie on
outside of J- -Box.
6. Route furnace power wires through holes in casing and
electrical box and into electrical box.
7. Pull field power wires into electrical box.
8. Remove cover from furnace J- -Box.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

120/c series

Table of Contents