Flange Locknut (1/2 Inch); Cylinder Lift Assembly; Inches) - Toro Outcross 9060 Series Installation Instructions Manual

Traction unit
Hide thumbs Also See for Outcross 9060 Series:
Table of Contents

Advertisement

Figure 2
1. Capscrew (1 x 1-1/4

inches)

2. Frame gusset (right rear)
3.
Align the holes in the left pivot bracket with the
holes in the gusset plate at the left frame rail
(Figure
3).
Figure 3
1. Capscrew (1/2 x 1-3/4
inches)
2. Gusset plate (left frame
rail)
3. Left pivot bracket
4.
Assemble the pivot bracket to the gusset plate
with 4 capscrews (1/2 x 1-3/4 inches) and 4
flange locknuts (1/2 inch).
5.
Torque the capscrews and nuts to 91 to 113 N∙m
(67 to 83 ft-lb).
6.
Align the holes in the right pivot bracket with the
holes in the gusset plate and bulkhead plate at
the right frame rail
7.
Repeat steps
4
and
3. Bulkhead plate (rear
hydraulic quick-connect
couplings)

4. Flange locknut (1/2 inch)

4. Flange locknut (1/2 inch)
5. Right pivot bracket
(Figure
3).
5
for the right pivot bracket.
4
Installing the Cylinder Lift
Parts needed for this procedure:
1

Cylinder lift assembly

2
Flange-head capscrew (1/2 x 1-3/4 inches)
g287289
Procedure
1.
Remove the top 2 flange-head capscrews (1/2
x 1-1/2 inches) and top 2 flange locknuts (1/2
inch) that secure the link-attach bracket to the
frame of the machine
Note:
You no longer need the 2 flange-head
capscrews (1/2 x 1-1/2 inches).
g258969
1. Flange locknut (1/2 inch)
2. Link-attach bracket
2.
Align the holes in the cylinder lift with the holes
in the frame of the machine and link-attach
bracket as shown in
5
(Figure
4).
Figure 4
3. Flange-head capscrews
(1/2 x 1-1/2 inches)
Figure
5.
g286329

Advertisement

Table of Contents
loading

This manual is also suitable for:

07530

Table of Contents