7 Configuration

6.9

About the compressor

DANGER: RISK OF EXPLOSION
▪ Use a pipe cutter to remove the compressor.
▪ Do NOT use the brazing torch.
▪ Use approved refrigerants and lubricants only.
DANGER: RISK OF BURNING
Do NOT touch the compressor with bare hands.
7
Configuration
7.1

Standby electricity saving function

7.1.1
About the standby electricity saving
function
This mode turns OFF the power supply of the outdoor unit and sets
the indoor unit into the standby saving mode to reduce the power
consumption of the unit.
This mode is only applicable for outdoor units: RZAG35A,
RZAG50A, RZAG60A and indoor units: FTXM.
INFORMATION
The standby electricity saving can ONLY be used for the
units described above.
WARNING
Before connecting or disconnecting the connector, make
sure the power supply is turned off.
INFORMATION
Selective connector for standby electricity saving is
required if other than applicable indoor unit is connected.
7.1.2
To turn on standby electricity saving
function
Prerequisite: The main power supply MUST be turned off.
1 Remove the service cover.
2 Disconnect the selective standby electricity saving connector.
Installer reference guide
20
1
2
2
2
1
8
8.1
This chapter describes what you have to do and know to
commission the system after it is configured.
Typical workflow
Commissioning typically consists of the following stages:
1
2
8.2
During test operation, the outdoor unit and the indoor units will start
up. Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation manual
of the indoor units for details.
8.3
After the installation of the unit, first check the following items. Once
all below checks are fulfilled, the unit MUST be closed, ONLY then
can the unit be powered up.
3 Turn on the main power supply.

Commissioning

Overview: Commissioning

Checking the "Checklist before commissioning".
Performing a test run for the system.

Precautions when commissioning

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
CAUTION
Do NOT perform the test operation while working on
the indoor units.
When performing the test operation, NOT only the outdoor
unit, but the connected indoor unit will operate as well.
Working on an indoor unit while performing a test operation
is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air
inlet or outlet. Do NOT remove the fan guard. When the
fan is rotating at high speed, it will cause injury.

Checklist before commissioning

The indoor unit is properly mounted.
The outdoor unit is properly mounted.
The system is properly earthed and the earth terminals
are tightened.
The fuses or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
RZAG35~60A2V1B
R32 split series
4P540076-1A – 2018.11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skyair rzag50a2v1bSkyair rzag60a2v1b

Table of Contents