LG 75SM9400PTA Service Manual page 25

Chassis ub92m
Table of Contents

Advertisement

3. Back Cover Assembly Guide
(1) After set B/C above Module, Push Latch Point in B/C Bending. (Push slope direction of B/C for preventing transform)
(2) Confirm Latch Assmble(If Latch is not assemble, Gap and lifting are made.)
* Latch Point refer to next page.
(3)Assemble the Screw of B/C and Stand.
B/C-Module Gap
- 25 -
Copyright ©
LG Electronics Inc. All rights reserved.
Only training and service purposes.
75SM90 Stand Screw : 4 Point
75SM90 Holder 10 Points
75SM90 Screw 16 Points
75SM90 Latch 3 Points
NG
Ok
Ok

Advertisement

Table of Contents
loading

This manual is also suitable for:

75sm9000pva

Table of Contents