Unpacking; Initial Inspection; Applying Power; Booting - Polaris ASLE-L-100D User Manual

Satellite link emulator
Table of Contents

Advertisement

ASLE-L-100D
Installation

Unpacking

Unpack the shipping container and take out the contents as shown in [Table 1].
Quantity
1
1
1

Initial Inspection

Inspect the ASLE-L-100D for any possible wear or damage. If the ASLE-L-100D
appears damaged when you first unpacked the container, please do not install the
instrument. Contact Polaris immediately.
▪ Address: #1913, Anam tower, 311 Teheran-ro, Gangnam-gu, Seoul, Republic of Korea
▪ Tel: +82-2-2009-2120
▪ Email: info@polariswave.com

Applying Power

ㆍ Place the ASLE-L-100D on the intended workbench and plug the power cord into
the AC power inlet on the rear panel.
ㆍ Press the power button located on the front panel.

Booting

When the power switch is turned on, letter strings as shown in [Figure 3-1 to 3-3]
[Table 1]
Description
ASLE-L-100D
AC Power Cord
User Manual
Copyright © 2022 Polaris. All Rights Reserved
User Manual
Remarks
Satellite Link Emulator
14

Advertisement

Table of Contents
loading

Table of Contents