ASLE-L-100D
Installation
Unpacking
Unpack the shipping container and take out the contents as shown in [Table 1].
Quantity
1
1
1
Initial Inspection
Inspect the ASLE-L-100D for any possible wear or damage. If the ASLE-L-100D
appears damaged when you first unpacked the container, please do not install the
instrument. Contact Polaris immediately.
▪ Address: #1913, Anam tower, 311 Teheran-ro, Gangnam-gu, Seoul, Republic of Korea
▪ Tel: +82-2-2009-2120
▪ Email: info@polariswave.com
Applying Power
ㆍ Place the ASLE-L-100D on the intended workbench and plug the power cord into
the AC power inlet on the rear panel.
ㆍ Press the power button located on the front panel.
Booting
When the power switch is turned on, letter strings as shown in [Figure 3-1 to 3-3]
[Table 1]
Description
ASLE-L-100D
AC Power Cord
User Manual
Copyright © 2022 Polaris. All Rights Reserved
User Manual
Remarks
Satellite Link Emulator
14