Mount Primary and Secondary Power Center To Wall
1. Locate a wall near the pool equipment area within 15
feet of the IntelliChlor cells. Position the primary and
secondary power center at eye level. Mount and
secure the power center bank to the wall using six
(6) screws (not provided in kit). Note: The
power centers are pre-wired to each other.
2. Remove the cover retaining screw and remove
the cover from the PRIMARY power center.
Connect AC Power Wires and ORP Sensor Wires
1. Provide 208-260VAC power to the PRIMARY POWER CENTER. This power should be on its
own breaker for future servicing. A (knock-out) opening is provided on the bottom of the power
center for a conduit.
Note: For 110VAC operations, each power center will need to be re-configured. A 110VAC
wiring diagram is provided on the inside of each the power center covers.
2. Splice the incoming AC power wires onto the two wires labeled WIRED FOR 220V. Do not
apply AC power yet.
3. Connect the two (2) twisted wires labeled ORP SENSOR to the ORP chlorine controller panel
(AcuTrol, etc. not provided in kit). Carefully place the connection inside of power center.
4. Replace the cover. Secure it using the retaining screw.
Connect these
wires to AC
power source
Communication
wires
Mount power centers to
wall using six (6)
Connect these
wires to ORP
PRIMARY
SECONDARY
IntelliChlor Salt Chlorine Generator COMSYS-8 Installation Guide
screws