Connect The Data Ports; Data Ports Led Information; Rj45 Port Leds (Inter-Cluster-Connect 1 And 2) - Extreme Networks Universal Compute Platform Appliance 4120C Installation Manual

Table of Contents

Advertisement

Connect the Data Ports

Data Ports LED Information

About This Task
Data ports 1 and 2 are 1/10 GbE RJ45 ports. Ensure that the device to be connected at the other end of
the segment is powered on.
To connect a twisted pair cabling:
Procedure
1. Connect the twisted pair segment to the appliance by inserting the RJ45 connector on the twisted
pair segment into the desired RJ45 port.
2. Verify that a link exists by checking that the Activity Link LED is on (solid green or blinking green). If
the Activity Link LED is off, perform the following steps until it is on:
a. Verify that the cabling being used is Category 5 or better (Category 6 or better for 10Gbps
connection), with an impedance between 85 and 111 ohms and a maximum length of 100 meters
(328 feet).
b. Verify that the device at the other end of the twisted pair segment is turned on and is properly
connected to the segment.
c. Verify that the RJ45 connectors on the twisted pair segment have the proper pinouts, and check
the cable for continuity.
3. If a link is not established, contact Extreme Networks.
Data ports 3 and 4 provide QSFP28 ports that can support 40 or 50Gbps transceivers, as well as 1,
10, and 25Gbps transceivers through special adapters. Refer to the optics page at the following
location for a list of pluggable transceivers supported for the 4120C:
optics.extremenetworks.com/.
Data Ports LED Information

RJ45 Port LEDs (Inter-Cluster-Connect 1 and 2)

LED type
Network speed (right)
18
Extreme Networks Universal Compute Platform Appliance 4120C
on page 18
LED pattern
Solid amber
Solid green
https://
Status
1000 Mbps (1 Gbps)
10000 Mbps (10 Gbps)

Advertisement

Table of Contents
loading

Table of Contents