TORUS 8 Rigging Manual
HF Right
Rotate the T8GRID through 180° and release links from the stow position
Position the T8GRID on top of the first TORUS 8 cabinet, rotate the links and insert the rigging pins.
Make sure the cabinet is secured on both sides before lifting.
Lift the array to a height where the next cabinet can be positioned underneath. Either lift the cabinet
into position or lower the array onto the cabinet below.
Remove the rigging pins from the cabinet below, rotate the links and insert the rigging pins to secure.
TORUS 8 Rigging Manual
Copyright © 2023 Martin Audio Ltd.
5