ECS L4IBMG2 Manual page 19

Table of Contents

Advertisement

L4IBMG2 / L4IBMGL2 V1.0b
CPU Installation Procedure
The following illustration shows CPU installation components:
Note: The pin -1 corner is marked with an arrow
Follow these instructions to insta ll the CPU:
1.
Install and secure the Retention Module on the mainboard.
2.
Pull the CPU socket-locking lever away from the socket to unhook it and raise
the locking lever to the upright position.
3.
Match the corner on the
CPU marked with an arrow
with pin-1 on the CPU
socket (the corner with the
pinhole noticeably missing).
Insert the processor into the
socket. Do not use force.
4.
Swing the locking lever down and hook it under the latch on the edge of the
socket.
5.
Apply thermal grease to the top of the CPU.
6.
Lower the heatsink over the CPU.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

L4ibmgl2L4ibmgl2 1.0L4ibmg2 1.0

Table of Contents