Siemens Maxum II Manual page 56

Process gas chromatograph
Hide thumbs Also See for Maxum II:
Table of Contents

Advertisement

Valves, Detectors, and External Systems
4.4 Methanator
never be cut or shortened or bent or bypassed in any way. If there is any physical damage,
the device should be shut down until it can be replaced.
The purged/pressurized methanator must not be operated without purge/pressurization
unless it has been verified that the area is free of explosive gases and vapors. This includes
opening the door to the electronics enclosure for routine maintenance.
The screw-on cap of the explosion proof/flameproof methanator must not be removed unless
it has been verified that the area is free of explosive gases and vapors or unless the
methanator has been given sufficient time to cool down (at least 30 minutes without power).
56
WARNING
WARNING
Explosion Protection Safety Standards
Manual, August 2017, A5E02220442001 Rev 8

Advertisement

Table of Contents
loading

Table of Contents