Toshiba MMY-SUG0801MT8P-E Installation Manual page 48

Hide thumbs Also See for MMY-SUG0801MT8P-E:
Table of Contents

Advertisement

Group control through a remote controller
SHRM Advance cannot connect to the model other than SHRM Advance and U series (TCC-LINK).
Group control of multiple indoor units (8 or 9 units) through a single remote controller
Indoor unit
No. 1
(A, B)
For the group connections without using FS units (Multi-port type, Single-port type) and SV units:
Remote controller
It is up to 9 units.
Max.number of connectable Leak Detector and Remote Controller is up to 2 units.
Indoor unit
No. 1
(A, B)
Leak
Remote
Detector
controller
For the group connection within each branch of the FS unit (Multi-port type and Single-port type) or SV unit :
It is up to 8 units.
Max.number of connectable Leak Detector and Remote Controller is up to 2 units.
FS unit or Shut-off Valve unit
Power supply wire connection
1. Insert the power supply wires from lower right of the electrical control box and connect them to the power
terminal blocks and the earth line to the earth screw, and then fix each of the five wires with each cord clamp
and binding band.
2. When finished wiring the power supply wires, get each of five wires through the cutout on the sealing material
(black) under the cord clamp to pull it outside the electrical control box. Tear upper and lower of the cutout on
the sealing material with your hands before getting the wires through the cutout.
3. Get the binding band through two holes in the right part of the valve fixing plate and fix the power supply wires
with it.
93-EN
No. 2
No. 3
No. 4
No. 2
No. 3
No. 4
– 47 –
No. 8
No. 9
FS : Flow Selector
SV : Shut-off Valve
No. 7
No. 8
25 mm
or more
Tear upper and lower of the
sealing material.
Earth line
Clamp base
Sealing material
Get the binding band through the hole at
one side of the clamp base and fix the
power supply wire securely with it.
Power supply wire
94-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents