Electrical Requirements; Brine Tank - Master MCA Alliance Series Installation And Operating Instructions Manual

Combination filter and softener
Table of Contents

Advertisement

Electrical Requirements:

Always follow all local electrical codes when installing our water treatment
equipment.
1. Provide an 115v/60Hz properly grounded dedicated electrical
Outlet. (It's very important that the polarity be correct)
Avoid using outlets that are switch controlled.
2. Maximum amperage required is 5 amps.
3. Make sure the electrical service provides power 24 hours per day.
We recommend installing a surge protector to protect unit from
power surges, which are not covered by warranty.

Brine Tank:

1. The brine tank should be located directly beside the combination unit
mineral tank.
2. Connect the 3/8" poly tubing to the 3/8" black elbow compression fitting
located on the top left side of the MCA control valve.
3. Place 2 gallons of water directly into the brine tank.
BRINE REFILL
CONNECTION
If the brine tank is equipped with a shutoff valve, the float height was
See Figure Below.
preset at the factory.
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents