Final Check - Master MCA Alliance Series Installation And Operating Instructions Manual

Combination filter and softener
Table of Contents

Advertisement

Final Check:

1. Fill the brine tank with Solar Salt and the Res-Up Feeders with Res-Up
(one quart is provided).
2. Make sure the drain line connection meets all plumbing codes and that
the drain line size can handle the backwash flow rate of the softener.
3. Make sure the Inlet and Outlet on bypass valve are open.
4. Make sure the control valve timer is plugged into an electrical outlet with
power 24 hours per day.
5. Check all piping for leaks.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents