Operation - Fluke IRR2-BT User Manual

Hide thumbs Also See for IRR2-BT:
Table of Contents

Advertisement

Operation

Use the Analyzer to adjust the recording settings, memory, and
clock synchronization. See SMFT-1000 Users Manual for more
information.
1. Power ON/OFF
At power on, the Meter shows the available memory in hours
for 2 seconds. The total memory capacity allows continuous
recording for 17 hours. Partial memory records for less time.
The display shows the Irradiance/Temperature mode
2 seconds after power up.
2. Move the Meter within wireless range of the main Analyzer.
The range is up to 50 m (150 ft) with a clear line-of-sight view
(no sight obstruction).
shows on the display when the Meter has wireless
connection to the Analyzer.
If already installed on the roof, it is not necessary to
move the Meter. Instead, move the Analyzer near the
building to establish the connection. When connection is
established, you can synchronize both units from the
ground.
3. When connected, the Analyzer sends the command to the
Meter for synchronization,
4
Note
shows on the display.

Advertisement

Table of Contents
loading

Table of Contents