Navien NCB700-2S Plus 42K Installation & Operation Manual page 40

Condensing combi boiler
Table of Contents

Advertisement

1
#
Description
1
Boiler
2
Visible air break
3
75 mm trap
4
Soil and vent stack
5
Invert
6
450 mm minimum up to three storeys
Minimum internal diameter 19 mm
7
(fall at least 45 mm per meter)
8
Pipe size transition
9
Minimum internal diameter 30 mm
10 Water/weather proof insulation
1
6
#
Description
1
Boiler
2
Visible air break
3
38 mm minimum trap
4
External length of pipe 3 m maximum
Open end of condensate drainage pipe direct into gully 25
5
mm min below grating but above water level; end cut at 45°
Minimum internal diameter 19 mm
6
(fall at least 45 mm per meter)
7
Pipe size transition point
8
Minimum internal diameter 30 mm
9
Water/weather proof insulation
40
Installing the System Piping
7
2
8
4
6
3
9
5
2
8
9
4
3
7
5
1
9
2
10
#
Description
1
Condensate discharge pipe from boiler
2
Pipe size transition point
3
Water/weather proof insulation
4
43 mm 90° male/female bend
5
External rain water pipe into foul water
6
External air break
7
Air gap
8
68 mm ø PVCu strap-on fitting
9
Minimum internal diameter 19 mm
10 Minimum internal diameter 30 mm
11 End cut at 45°
8
1
9
10
#
Description
1
Condensate discharge pipe from boiler
Ground (this section of the condensate drainage pipe may
2
be run either above or below ground level); End cut at 45°
3
Diameter 100 mm minimum plastic tube
4
Bottom of tube sealed
5
Limestone chippings
Two rows of three 12 mm holes at 25 mm centres, 50 mm
6
from bottom of tube and facing away from house
7
Hole depth 400 mm minimum by 300 mm diameter
Minimum internal diameter 19 mm
8
(fall at least 45 mm per meter)
9
Pipe size transition point
10 Minimum internal diameter 30 mm
11 Water/weather proof insulation
5
3
6
7
8
11
4
≥500
11
2
3
4
5
6
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb700-3s 54k

Table of Contents