Coupling Alignment Check; Fluid Level Check; Electrical Preparation - Sullair LS-25S-257KW Operator's Manual And Parts List

Industrial rotary screw air compressor
Table of Contents

Advertisement

Section 4
INSTALLATION
Figure 4 ---1 Service Air Piping (Typical Installation)

4.5 COUPLING ALIGNMENT CHECK

In preparation for the factory test, the coupling sup-
plied with your compressor is properly aligned for
operation. However, due to shipping and handling,
it is necessary to recheck the coupling alignment.
Refer to Coupling Alignment procedure explained
in the Maintenance section of this manual.

4.6 FLUID LEVEL CHECK

Your air compressor is also supplied with the
proper amount of fluid. However, it is necessary to
check the fluid level at installation. The level is
checked by looking at the sight glass located on
the sump. If the sump is properly filled, the coolant
level should fill 1/2 of the sight glass when the com-
pressor is shutdown.

4.7 ELECTRICAL PREPARATION

Interior electrical wiring is performed at the factory.
Required customer wiring is minimal, but should
20
BLOCK AND
BYPASS VALVES
be done by a qualified electrician in compliance
with any applicable regional or local electrical code
concerning isolation switches, fuse disconnects,
etc. Sullair provides a wiring diagram for use by the
installer.
DANGER
!
Lethal shock hazard inside.
Disconnect all power at source before opening or
servicing starter or control panel.
1. Check incoming voltage. Be sure that the incom-
ing voltage is the same voltage that the com-
pressor was wired for.
2. Check starter and overload heater sizes (see
electrical parts in Parts Manual).
3. Check all electrical connections for tightness.
4. "DRY RUN" the electrical controls by discon-
necting the three (3) motor leads from the

Advertisement