Reassemble The Signal Generator; Instrument Calibration - Agilent Technologies ESG Series Installation Manual

Hide thumbs Also See for ESG Series:
Table of Contents

Advertisement

Reassemble the Signal Generator

1. Reconnect all cables to the CPU/Motherboard. Refer to the service guide if necessary. Verify that all
cables are correctly reconnected.
2. Reinstall the rear panel to the signal generator. Reverse the rear panel procedure to attach the rear
panel. Torque the screws and nuts to the following:
• Torque all T-10 TORX screws to 9 in-lbs.
• Torque the AUXILIARY INTERFACE hex screws to 6 in-lbs.
• Torque the GPIB hex screws to 9 in-lbs.
• Torque the five BNC connector nuts to 21 in-lbs.
3. Reinstall the signal generator's bottom cover with the 15 screws. Torque to 9 in-lbs.
4. Reinstall the Baseband Option 1EH (A7) or Option UN3/4 (A7 & A8) if applicable.
5. Reinstall the signal generator's cover-top with the 11 screws. Torque to 9 in-lbs.
6. Slide the signal generator top cover back onto the signal generator.
7. Attach the rear feet, the four bottom feet, and the two strap handles to the signal generator's cover.
Torque the strap-handle screws to 21 in-lbs.
Verification of Signal Generator Operation
1. Turn the signal generator's power switch on. Let the signal generator warm up for five minutes.
2. Press the front panel
3. Review the
"Check Instrument

Instrument Calibration

Refer to the "Post-Repair Procedures" chapter of the service guide to determine which performance
tests and adjustments are required to calibrate your signal generator. You will then need to refer to the
Calibration guide for performance tests and adjustment procedures.
Installation Note E4400-90388
button to reset the signal generator.
PRESET
Functionality" on page 5.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4420aE4400aE4421aE4422aE4430aE4431a ... Show all

Table of Contents