Storage Tank And Startup - GE PNRQ20RBL Owner's Manual & Installation Instructions

Reverse osmosis filtration system
Table of Contents

Advertisement

Available languages

Available languages

STORAGE TANK AND STARTUP

STORAGE TANK INSTALLATION
1. Remove the protective cap from the top of the
tank.
2. Apply 2–3 wraps
of thread tape,
in a clockwise
direction, to the
tank threads.
3. Install the push-to-connect fittings on the
threaded fitting on the tank as shown.
Storage tank
4. Push the 3/8" red banded tubing from the
Reverse Osmosis System into the fitting on the
storage tank.
Installation Instructions
Thread
tape
SYSTEM STARTUP PROCEDURE
IMPORTANT
construction, ensure that house plumbing is flushed
thoroughly before opening the water supply valve.
1. Check that all tubing connections are secure.
2. Turn on the Feed Water Supply Valve.
3. Check all connection points for leaks.
4. Follow the sanitization procedures on page 20.
5. After sanitization is complete, reinstall prefilter,
postfilter and Reverse Osmosis cartridges.
6. Membrane contains a food grade preservative.
Allow the system to fill the tank, then drain it
completely four times before using the water
from the system.
7. Recheck all water connection points a few days
later to check for small leaks.
18
— If installing the unit in new

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pnrq21rbnPnrq21rrb

Table of Contents