About The Box; Outdoor Unit; To Handle, Unpack And Remove Accessories - Outdoor Unit - Daikin Altherma 3 R ECH2O Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R ECH2O:
Table of Contents

Advertisement

4
|

About the box

4 About the box
In this chapter

4.1 Outdoor unit

4.1.1 To handle, unpack and remove accessories – Outdoor unit
Installer reference guide
22
Keep the following in mind:
At delivery, the unit MUST be checked for damage and completeness. Any
damage or missing parts MUST be reported immediately to the claims agent of
the carrier.
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
Prepare in advance the path along which you want to bring the unit to its final
installation position.
4.1
Outdoor unit ...........................................................................................................................................................................
4.1.1
To handle, unpack and remove accessories – Outdoor unit.................................................................................
4.1.2
To remove the transportation stay........................................................................................................................
4.2
Indoor unit ..............................................................................................................................................................................
4.2.1
To unpack the indoor unit......................................................................................................................................
4.2.2
To remove the accessories from the indoor unit ..................................................................................................
4.2.3
To handle the indoor unit ......................................................................................................................................
CAUTION
To avoid injury, do NOT touch the air inlet or aluminium fins of the unit.
1 To handle the unit before unpacking, use a forklift or pallet truck.
2 When you are near the final installation position, remove the cardboard box.
ERLA11~16DAV3+W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1B – 2022.07
22
22
24
25
25
25
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents