Table Of Contents - Mitsubishi Heavy Industries FDE40ZMXVG Technical Manual

Inverter packaged air-conditioners
Table of Contents

Advertisement

1
4
e
1
2
1
3
f
Reducer set ø15.88
1
4
CAUTION
1) Delivery
● 
● 
When you have to unpack the unit for a compelling reason before you haul it to the
installation point, hoist the unit with nylon slings or ropes and protection pads so that
you may not damage the unit.
2) Portage
A person carrying the right hand side must take heed of this fact. A person carrying
the left hand side must hold with his right hand the handle provided on the front panel
of the unit and with his left hand the corner column section.
〇 A place where good air circulation can be secured, and enoug hservice space can be secured for maintenance
〇 A place where the unit will not be affected by electromagnetic waves and/or high-harmonic waves generated by
harm the unit, will not be generated and not remain.
〇 If a operation is conducted when the outdoor air temperature is -5˚C lower, the outdoor unit should be installed
at a place where it is not influenced by natural wind.
1
2 Provide a snow hood to
draining water is secured.
● 
Don't execute drain piping work by using a drain elbow and drain grommets (accessories).
[Refer to Drain piping work.]
● 
Attached heater on a base plate on site, if there is possibility to freeze drain water.
threatment against freezing but be sure not to melt the material of drainage paths with heat.
   ● 
Check the following points in light of the indoor unit specifications and the installation site.
5
Drain hose (extension hose)
1
6
Piping cover
7
1
(for insulation of connection piping)
8
(Take particular care in car rying in or moving the unit, and always pe rform such an operation with two or more persons.)
Pad
Heavy
3 Install the unit under eaves
the outdoor unit on site.
or provide the roof on site.
Hammer
~
~
8.2kgf·m)]
1.Install the outlet air blow side of the
2.Install the outlet air blow side of
unit to face a wall of building, or
provide a fence or a windbreak screen.
Over 500 mm
● 
● 
● 
When more than one unit are installed side by side, provide a 250mm or wider interval between them as a service
space. In order to facilitate servicing of controllers, please provide a sufficient space between units so that their
top plates can be removed easily.
● 
● 
When more than one unit are installed, provide sufficient intake space consciously so that short-ci rcuiting may not occur .
● 
Example installation
Ⅱ 
Ⅰ 
Size
Open
280
L1
100
75
L2
80
L3
100
L4
250
Open
88.4
510
200
Intake
Outlet
● 
● 
● 
● 
● 
Install the unit in a level area. (With a gradient of 5 mm or less.)
Improper installation can result in a compressor failure, broken piping within the unit and abnormal noise generation.
when the outdoor temperature is -5°C or lower.
● 
14
Flaring tool set (Designed specifically for R410A)
15
Gas leak detector (Designed specifically for R410A)
Gauge for projection adjustment
16
(Used when flare is made by using conventional flare tool)
3.The unit should be installed on
the unit in a position perpendicular
the stable and level foundation.
to the direction of wind.
If the foundation is not level,
the down the unit with wires.
Wind direction
Wind direction
The height of a wall is 1200mm or less.
L
(mm) 
Intake
3
L
service
(
2
Ⅲ 
Ⅳ 
space
L
4
280
180
Intake
Open
Open
80
80
Outlet
L
1
250
Open
②   N otabilia for installation
Fasten with bolts
(M10-12)
Use a long block to
Use a thicker block to   a nchor deeper.
extend the width.
)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents