Samsung QN82Q8FNBF Service Manual page 8

Qled tv
Table of Contents

Advertisement

3. Disassembly and Reassemble
Description & Screws
8
Remove the Cables.
LEAD CONNECTOR-POWER
(LD - SMPS)
LEAD CONNECTOR-POWER
(MAIN - SMPS)
LEAD CONNECTOR-DIMMING
(LD - MAIN)
FFC CABLE
(MAIN - T-CON)
LEAD CONNECTOR-POWER
(T-CON - SMPS)
9
Remove the ASSY PCB MAIN BOARD.
Gently lift up (Top Right corner) to release
the lock.
Use both hands to hold the board and slide
to the left to release the board.
NOTE
When installing the ASSY PCB MAIN BOARD,
verify the board is properly positioned in all 4
mounting slots.
Locking
3-4
Locking
Fixing Hole
Picture Description
Slide to the left to release the board
Bottom chassis Guide Fixing Hole

Advertisement

Table of Contents
loading

Table of Contents