Chapter 4 Post-Installation Check And Adjustment; Line Voltage - Furuno CI-35 Installation Manual

Doppler sonar current indicator
Hide thumbs Also See for CI-35:
Table of Contents

Advertisement

CHAPTER 4 POST-INSTALLATION
CHECK AND ADJUSTMENT

4.1 Line Voltage

1) Transceiver Unit
1. Turn the power switch on. Confirm that the POWER lamp lights and there is input
voltage at the service outlet. Also confirm that 100 VAC is present between terminals #
10 and #11 of TB5.
JIFA JCP JFT JLG
TB5
Power Lamp
Service Outlet
Power Switch
(Input voltage present)
Fig. 4-1 Transceiver Unit, Inside view
JTC
JTRA
JCN
4-1
PWR SUPPLY
Fuse for input
voltage of
transmitter
Maintenance
Switch
R31 For Intrference
R32 Rejection
(See page 4-18)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ci-35h

Table of Contents