Installation; Assembly And Connections - Honeywell Notifier NFG-8 Installation And Operation Manual

Central gas detection
Table of Contents

Advertisement

National regulations
This equipment must be installed and operated in accordance with these instructions and the
regulations in force at the place of installation.
2)

INSTALLATION

2.1)

Assembly and connections

Remove the 4 screws located at the 4 corners of the box and remove the front of the control unit
box. Now it is possible to choose where to insert the cables. We recommend that you insert the
cables using a suitable cable press.
Fix the rear part of the control unit to the wall using the holes provided.
Connect the three-pole mains cable (minimum 1.5mm2 for each pole) to the power
supply terminal block and tighten it with the cable clamp.
Power up the control unit and then connect the two 12 V 7 Ah lead buffer batteries in
series to the red and black faston cables of the power supply unit.
NFG-8
NFG-8_manu-inst_ITA
Fig. 2-1) Central box
Installation and Operation
Manual
Doc. M-040.1-NFG8-EN
Rev A.3
PAGE - 11