2
Hardware Installation
Connect the Makeup Gas Supply
Connect the makeup gas source to the PCM or Auxiliary Pressure controller.
To supply the makeup gas froma PCM
1 Connect the tubing from the PCM to the 1 meter length of stainless steel
2 Connect the free end of the stainless steel tubing to the tubing from the
Figure 10
To supply the makeup gas from an Auxiliary Pressure controller
1 Install the brown-dot frit (part no. 19231-60610) in the output channel. See
2 Connect the tubing from the Auxiliary Pressure controller to the tubing
This completes the hardware installation.
24
tubing from the kit with a union.
splitter assembly with a union. See
PCM
Plumbing a PCM makeup supply
your GC manual for details.
from the splitter assembly with the 1/8 to 1/16-inch stainless steel reducing
union.
Figure
10.
Stainless
steel
tubing
Union
Union
To splitter
Installation and Operation Guide