Items
(R) Charging Check
Note:
After the measuring, sock up the solder of TP.
* :
PC Setting
() is required beforehand.
The connection of adjustment equipment are as shown in
14.2. Adjustment Standard (Base Unit)
When connecting the Simulator Equipments for checking, please refer to below.
14.2.1. Component View
Note:
(I) - (P) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
14.2.2. Flow Solder Side View
Note:
(A) - (Q) is refered to
14.3. Adjustment (Charger Unit)
Items
(A) Charging Check
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
14.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
Adjustment
Point
1. Connect Charge Contact 12
-
2. Measure and confirm voltage across the regigster is 2.85V ± 0.2V.
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
Adjustment
Point
1. Connect Charge Contact 12
-
2. Measure and confirm voltage across the regigster is 2.7V ± 0.2V.
Procedure*
/2W register between charge+ and charge-.
Adjustment Standard (Base Unit)
Procedure
/2W register between charge+ and charge-.
Adjustment Standard (Charger Unit)
55
().
()
()
Check
Replace
D6,R4,R5,C1
D1,CN2,C1
Check
().