8 Evacuation and Charging Process

8.1 Preparations and Precautions

Air and foreign matter in the refrigerant circuit can cause abnormal rises in
pressure, which can damage the air conditioner, reduce its effi ciency, and cause
injury. Use a vacuum pump and manifold gauge to evacuate the refrigerant circuit,
removing any non-condensable gas and moisture from the system.
Evacuation should be performed upon initial installation and when unit is relocated.
Before performing evacuation
 Check to make sure that both high-pressure and low-pressure pipes
between the indoor and outdoor units are connected properly in
accordance with the Refrigerant Piping Connection section of this manual.
 Check to make sure all wiring is connected properly.
 Perform nitrogen leak check on all refrigerant joints.

8.2 Evacuation Instructions

Before using the manifold gauge and vacuum pump, read their operation manuals
to familiarize yourself with how to use them properly.
Manifold Gauge
Compound gauge
-76cmHg
or -29.92"Hg
Low pressure valve
Pressure hose /
Charge hose
Low pressure valve
Figure 36
1.
Connect the charge hose of the manifold gauge to service port on the
outdoor unit's low pressure valve.
2.
Connect another charge hose from the manifold gauge to the vacuum pump.
3.
Open the Low Pressure side of the manifold gauge. Keep the High Pressure
side closed.
4.
Turn on the vacuum pump to evacuate the system.
5.
Run the vacuum until the Compound Meter reads -76cmHg / -29.92"Hg
(-101 kPa). It is recommended to use a micron gauge; run the vacuum until
the micron gauge reads 350 to 500 microns or less.
6.
Close the Low Pressure side of the manifold gauge, and turn off the vacuum
pump.
Bosch Climate 5000 Series Wall Mounted Ductless Split Air Conditioner / Heat Pump (06.2022)
Pressure gauge
High pressure
valve
Charge hose
Vacuum
pump
7.
Wait for approximately 10 to 15 minutes, then check that there has been no
change in system pressure. It is recommended to use a micron gauge; check
to make sure the system is still below 500 microns.
Flare nut
Valve body
Valve stem
Figure 37
8.
Remove the charge hose from the service port.
9.
Using allen wrench, fully open both the high pressure and low pressure
valves.
10.
Tighten valve caps on all three valves (service port, high pressure, low
pressure) by hand. You may tighten it further using a torque wrench if
needed.
NOTICE: Open service valve gently
 When opening service valve, turn the allen wrench until it
hits against the stopper. Do not try to force the valve to open
further.
Installation Instructions
Cap
| 25