547K*04-07 SINGLE PACKAGE ROOFTOP COOLING ONLY/ELECTRIC HEAT UNIT
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding
sections of this Service and Maintenance Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME _____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit
Verify installation of outdoor air hood
Verify that condensate connection is installed per instructions
Verify that all electrical connections and terminals are tight
Check that indoor-air filters are clean and in place
Check that outdoor air inlet screens are in place
Verify that unit is level
Verify that fan assembly is free of obstructions and rotor spins freely
Verify that scroll compressors are rotating in the correct direction
Verify installation of thermostat
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
Outdoor Fan Amps
TEMPERATURES
Outdoor-air Temperature
Return-air Temperature
Cooling Supply Air Temperature
PRESSURES
Refrigerant Suction
Refrigerant Discharge
Verify Refrigerant Charge using Charging Charts (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job requirements (if equipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

START-UP CHECKLIST

(REMOVE AND USE FOR JOB FILE)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
L1 _____________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
____________ PSIG
____________ PSIG
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
L2 _____________
_____________ °F WB (Wet Bulb)
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
Form No: 547K-4-7-01
CL-1