•
•
Systems
•
•
•
Thread tape on machine.
•
02A
•
03L
•
A
w
04C
m
w
05C
•
•
06H
•
10.02
05D
•
04C
Hold R2, load-
•
rewind
06H
•
transfer.
01H
•
tape-end lights.
04D
Pick R5, R6, start
•
a
04D
•
•
Sequence of
Operation
Push load-rewind
button.
Pick R40, rewind
R 42-3n /c, relay driver
PU
(75.08), manual load-
rewind line and read
status.
Pick R2, load-
R 4 0 -ln /o
rewind.
Pick R3, R31,
R2BLn/0
load-rewind.
LT R21, R26,
unload.
Pick HD4, vacuum
R 2 6 -ln /c
mtr.
HD4 pt.
Start vacuum mtr.
Drop R i l , R22,
R21-4
unload.
R2ALn/o, caps out m icro
switches.
Hold R13, clutch
R3BU
Shunt load pt. and
R3AU
R2AU, reel-a rm switch
slow rewind and
HD7, time delay.
R5ALn/o
Hold R5, R6, HD7.
Conditions
so tape can be threaded
on the machine easily.
R40 has no hold circuit.
R13 holds through a
different point.
25
Remarks