Important Start-Up Information - Siemens POLYMOBIL Plus Start-Up Instructions

Hide thumbs Also See for POLYMOBIL Plus:
Table of Contents

Advertisement

1 - 4
Connect the POLYMOBIL Plus only to a line voltage supply (receptacle) that complies
with the requirements of VDE 0107 or corresponds to the local national standards.
Disconnect the POLYMOBIL Plus at the line voltage OFF switch on the operating
console and disconnect the line voltage plug prior to any service work.
Remove or insert boards with the generator switched OFF only; observe
ESD guidelines when handling boards.

Important start-up information

After completion of the start-up procedure, the POLYMOBIL Plus which has been
completely tested and adjusted at the factory, is ready to operate.
The POLYMOBIL Plus can be connected to nominal line voltages from 110 V AC through
230 V AC (
NOTE
After start-up, country-specific tests are to be performed, if required;
e.g. acceptance test according to RöV (Germany - X-ray ordinance).
Acceptance test according to RöV (Germany):
Required measurements can be partially transferred from the test protocol provided.
The following values are measured at the factory and recorded in the test certificate:
POLYMOBIL Plus
±
10%) and automatically self-adjusts to the existing power line voltage.
Adhere to the fuse ratings for the on-site receptacle:
- 16A slow-blow (on-site) at 110V
voltage.
The line voltage cable of the POLYMOBIL Plus is supplied with a
(Schuko) safety plug.
Install line voltage plugs that comply with the local standards, if
required.
- Light localizer brightness
- Filter values - visual check
- Coincidence of light field and radiation field
- X-ray tube voltage accuracy
- mAs value check
- Reproducibility of the radiation
SPR8-125.034.02
Rev. 02
03.05
Requirements
±
±
10% or 230V
10% line
Page 4 of 10
CS PS 24
1
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

This manual is also suitable for:

12000

Table of Contents