Installation Manual
Position terminal [1] from the outside through the vent
opening so rubber thimble [2] is flush against outside wall
(Fig. 6) .
Slide the inner wall seal [3] onto the terminal [1] as shown
(Fig. 6).
3
2.
Fig. 6 Inserting termination from the outside
Connect the termination to the elbow or to additional
concentric pipe if extending the vent length.
Fig. 7 Completed adapter and concentric assembly
Ensure all components are properly connected and aligned,
and that the termination has the proper pitch as shown in
Fig. 4.
Using screws provided, secure inner and outer wall seals to
the wall.
Complete installing the appliance per the Boiler Installation
Instructions.
Bosch Thermotechnology Corp.
2
1
1.