12
INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
Preview Installation Order
Checking and
choosing the proper
location
Connecting the inlet hose
120V~
Plugging in the power cord
and grounding
Installing on a pedestal
1
29
/
"
2
(75.0 cm)
NOTE
Refer to the instructions packaged with the optional
pedestal kit before installing with a pedestal kit.
240V~
5"
(12.7 cm)
Leveling the dryer
Connecting gas
dryers
Press and hold
Installation test
Venting the dryer
Connecting electric
dryers
Test run