Overhead Clearance

A minimum clearance of 24 inches (61 cm) above the library is required in order to
remove the library enclosure. When combined with the height of the library (21
inches/53 cm), this is a total of 45 inches (114.3 cm) from the floor (stand-alone
library) or bottom of the slide (rackmount library).

Power and Grounding

The library auto-ranging motor and logic power supplies accept single-phase input
power range of 90 to 132 and 180 to 264 VAC at 47 to 63 Hz. In the United States and
Canada, the power inlet is an IEC-320 connector (
America, replace the power cord set with a harmonized 3 by 1.0 mm
approved by the country where used.
Caution – The installation site must provide an earth ground cable for the library.
For rackmount installations, the rack must also be grounded.
Ground
Line
FIGURE 2-3
Consider the current rating of the rack before installing the library. For example, no
more than two libraries can be installed in a typical 15A/120V rack. A 24A/200-
240V rack can support a maximum of three libraries.
If other equipment is installed in the rack, determine the total current rating of all
equipment before adding the StorEdge L1000 library to the rack.

Environmental Requirements

The installation site (stand-alone library) or the interior of the rack (rackmount
library) must meet the following environmental requirements:
Humidity: 20% to 80%, non-condensing
Temperature: 15 degrees C to 35 degrees C (59 degrees F to 95 degrees F)
Altitude: sea level to 10,000 feet (3,000 meters)
14
Sun StorEdge L1000 User's Guide • May 1998
AC Power Receptacle
FIGURE 2-3
~100-120V / ~200 - 240V
6A / 3A
IEC-320 Type
Neutral
). Outside North
2
power cord set
50/60 Hz