Cisco OL-7822-06 Quick Start Manual page 16

Cisco service control engine
Table of Contents

Advertisement

Mount the System to the Rack
A rack with both front and back posts will have the crossrail supports installed. Slide the SCE 1000 onto
these crossrails and push it all the way back.
While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets with
Step 4
the holes on the rack or mounting strip.
Figure 2-8
Step 5
For each bracket, insert and tighten two appropriate screws to the rack.
Since the brackets support the weight of the entire SCE 1000 chassis, be sure to use all four screws to
Note
fasten the two rack-mount brackets to the rack posts.
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
2-6
Securing the SCE Platform to the Rack
1
PW R A
PW R B
STA TUS
BYP ASS
MN G 1
C is co SC
MN G 2
CON SOL
E
LINK /
AUX
LINK RX
10/1 00/
TX
ACT IVE
LINK /
1000
10/1 00/
LINK RX
ACT IVE
1000
TX
RX
MM
TX
RX
MM
TX
GBE -1
SUB
LINE
NET
2
3
E 10 00
Se rie s
2x G BE
Chapter 2
Rack-Mount the SCE 1000
OL-7822-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 2xgbe

Table of Contents