Cisco OL-7822-06 Quick Start Manual page 15

Cisco service control engine
Table of Contents

Advertisement

Chapter 2
Rack-Mount the SCE 1000
SUMMARY STEPS
1.
2.
3.
4.
5.
DETAILED STEPS
Make sure that the rack brakes are locked or that the rack is otherwise stabilized.
Step 1
Figure 2-7
Step 2
Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the rack.
To prevent injury, avoid sudden twists or moves.
Step 3
Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.
OL-7822-06
Make sure that the rack brakes are locked or that the rack is otherwise stabilized.
Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the
rack. To prevent injury, avoid sudden twists or moves.
Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.
While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets
with the holes on the rack or mounting strip.
For each bracket, insert and tighten two appropriate screws to the rack.
Sliding the SCE Platform into the Rack
PWR A
PWR B
STATUS
MNG 1
MNG 2
BYPASS
Cisco SCE
CONSOLE
AUX
LINK RX
2000
Series
LINK/
ACTIVE
1000
10/100/
LINK/
ACTIVE
10/100/
TX
LINK RX
4xGBE
1000
TX
LINK RX
TX
RX
LINK RX
TX
MM
TX
RX
MM
TX
RX
MM
GBE-1
TX
RX
MM
TX
SUB
LINE
NET
GBE-2
SUB LINE/CASCADE
NET
PW R A
PW R B
STA TUS
BYP ASS
MN G 1
MN G 2
CON SOL
E
AUX
LINK RX
LINK /
10/1 00/
TX
ACT IVE
LINK /
1000
10/1 00/
ACT IVE
1000
RX
MM
TX
GBE -1
SUB
LINE
1
C is co SC
E 10 00
Se rie s
2x G BE
LINK RX
TX
RX
MM
TX
NET
2
3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
Mount the System to the Rack
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 2xgbe

Table of Contents