Trane RTXC XE Series Installation Operation & Maintenance page 48

Air-to-water screw heat pump
Table of Contents

Advertisement

5.
Clean and repaint any areas that show signs of corrosion.
6.
Inspect all piping components for leakage and/or damage. Clean all water strainers.
7.
Inspect the air side heat exchanger. Clean if necessary.
8.
Inspect the evaporator tubes for fouling. Clean if necessary.
9.
Clean the condenser fans. Manually rotate the condenser fans to ensure all the fans can rotate freely.
10. Check and tighten all electrical connections as necessary.
11. Inspect the entire system for unusual conditions.
TD7 Log
Refer to following
Figure 18
Figure 18 Report
Figure 19 Log Sheet
Table 10 RTXC XE Pre-Start Check List
Jobsite Name:
Unit Model #:
Sales Order #:
and
Figure
19, Operator Log can be captured on TD7.
RTXC XE Start-up Test Log
Jobsite Location:
Unit Serial #:
Ship Date:
Jobsite Elevation(m. above sea level):
Start Date:
48

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rtxc110xeRtxc160xeRtxc180xeRtxc200xeRtxc220xe

Table of Contents