TOR
The unit is suitable for indoor installation or outdoors in a partially protected place (according to EN 15502) with tempe-
ratures to -5°C.
The boiler shall not be installed in Area 0, 1 and 2 or any room with bathtub, shower room, wash zone and showers Ho-
wever, it can be installed in Area 3. In case of possible water flow for cleaning (public watering place, pipe and shower
nozzle used in the school, factory, sports club and public service area), the electric boiler cannot be installed.
If the boiler has been installed in an acceptable place, the protection from current accident must be provided as per the
same standard at the same time.
fig. 6

2.2 BOILER INSTALLATION

To hang the boiler on the wall, it's suggested to use the expan-
sion screw (accessory when delivery) which shall be fixed on
the wall in advance (refer to Figure 6). The heater structure
body with water pump and accessories shall be hung onto the
expansion screw which has been fixed. The boiler outer cover
shall be connected to the back wall by the screw which can be
disassembled. Before the boiler is installed, the place where
the repair work likely required can be conducted without big
restrictions shall be confirmed. If the boiler is installed in an
open system, the heating system water column shall at least
produce 1 bar pressure.