Installing The Turbocharger; Fig. 9: Inserting Gaskets Into The Bracket - ABB HT575750 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
2 Removing and Installing / 2.3 Installing the turbocharger
2.3

Installing the turbocharger

2.3.1
Inserting gaskets
CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
Always use new gaskets and insert them carefully into the slot.
u
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the ABB Turbo
Systems scope of delivery.
Fig. 9: Inserting gaskets into the bracket
01Bracket
02Oil supply
03Oil drain
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can
be different for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent
incorrect fitting. This pin fits into the respective slot on the foot of the bearing casing. In-
structions of the enginebuilder must be observed.
© Copyright 2017 ABB. All rights reserved.
04Slot for O-ring
05O-rings
06Pin (optional)
HZTL4031_EN
Revision F
August 2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

A145-m56

Table of Contents