Installation And Startup - Dell 1000T Getting Started

Tower ups 500w, 1000w, and 1920/1500w
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 4

Installation and Startup

CAUTION:
Before performing the procedures in this document, read and follow the safety instructions and
important regulatory information in your Safety, Environmental, and Regulatory Information document.
CAUTION:
The cabinet is heavy [500W: 11.6 kg (25.6 lb); 1000W: 18.3 kg (40.3 lb); 1920/1500W: 30.5 kg (67.2 lb)].
Use caution to unpack and move the cabinet.
This section describes the steps to set up your system for the first time.
Unpacking the System
Unpack your system and identify each item.
1
Discard or recycle the packaging in a responsible manner, or store it for future use.
2
Installation and Startup
3
|

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H900nJ715nK788nH914nJ716nK789n

Table of Contents