Prepare The Site - Kohler K-514 Installation Manual

Bath whirlpool
Hide thumbs Also See for K-514:
Table of Contents

Advertisement

Available languages

Available languages

Bath
1/16"
(2 mm)
Tile
Brick
Approved
Tile Backing
Approved Tile Backing
Two Wall Installation

1. Prepare the Site

Concrete Construction
NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your
whirlpool for specific floor loading requirements.
CAUTION: Risk of product damage. Do not support the whirlpool by the rim.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
The whirlpool should be installed in an alcove installation (a two wall installation is also
acceptable).
Install an access panel to allow the pump to be serviced.
Construct brick or concrete supports. When installing with two walls, the supports on the flanged
side of the whirlpool should rise to the top of the flange.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
Kohler Co.
Raise the sidewall to the
height of the flange.
Tile
Brick
Typical
access
panel
Install an access panel to allow
the pump to be serviced.
5
Alcove Installation
1019484-2-C
Typical
access
panel

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-513K-723K-724K-783K-784K-809 ... Show all

Table of Contents