STEP 1
DETERMINE LOCATION FOR CONCRETE
PAD AND OPERATOR
COMPACT INSTALLATION ONLY
DO NOT run the operator until instructed.
Refer to the illustration to determine the measurements and location of
the concrete pad.
NOTE: When lifting the operator use the handle to avoid damaging the
operator.
STEP 2
CONCRETE PAD AND OPERATOR
ATTACHMENT
COMPACT INSTALLATION ONLY
Check the national and local building codes before installation.
1. Install the electrical conduit.
2. Pour a concrete pad (reinforced concrete is recommended). The
concrete pad should be 6 inches above the ground and deeper than
the frost line. Ensure the pad is tall enough to avoid possible flooding.
3. Secure the operator to the concrete pad with appropriate fasteners.
NOTE: An alternative to a concrete pad is to post mount the operator
(refer to accessories).
CONDUIT LOCATION
5.5"
1"
4.5"
4"
6.5"
(Conduit)
1.5"
10"
15"
(Pad)
24"
MOUNTING FOOTPRINT
13.6"
12.2"
6.1"
3"
20"
28"
14.82"
(cover mounting distance)
APPENDIX
TOP VIEW OF OPERATOR AND GATE
Gate Hinge Center
Gate Open
90°
Handle
3
4 Concrete
Anchors
1/2" x 3 1/2"
2.49"
1
14"
38
NOTE: There should only be a maximum of
4" (10.2 cm) from the center of the hinge to
the edge of the post or column. If the distance
is greater than 4" (10.2 cm) entrapment
4" (10.2 cm) maximum
protection for this area is required.
Output Shaft Center
26-1/2"
9"
24"
24"-32"
2
28"
24"
28"
Post Mount
6" Above Ground
Below the frost
line. Check all
national and
local codes.