Section 5 − Installation; Selecting A Location - Miller S-74DX Owner's Manual

Table of Contents

Advertisement

5-1. Selecting A Location

OM-1500-9 Page 14
SECTION 5 − INSTALLATION
1
5
!
Do not move or operate unit where it could tip.
3
4
2
6
!
Do not put feeder where
welding wire hits cylinder.
.
Wire feeder shown is repre-
sentative only and may not
reflect actual unit.
1
Wire Feeder
2
Rubber Feet
Choose slot that allows all rubber
feet to sit securely on top of welding
power source.
3
Wire Spool/Reel
4
Gas Cylinder w/Hose And
Regulator (Customer
Supplied)
.
Shielding gas pressure not to
exceed 100 psi (689 kPa).
5
Welding Power Source
6
Running Gear
loc_feeder/cart 2015-05

Advertisement

Table of Contents
loading

This manual is also suitable for:

300618300618001300618002300618003300618006

Table of Contents