Installation; Downtime After Installation; Ventilation; Before Moving The Tumble Dryer Again - Miele TWB120WPT1 Operating Instructions Manual

Heat-pump
Table of Contents

Advertisement

Installation

Installation
Levelling the tumble dryer
Ensure that no closeable door,
sliding door or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.
The appliance must stand perfectly
level to ensure safe and proper
operation.
The screw feet can be adjusted to
compensate for unevenness in the floor.

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
starting a drying program.

Ventilation

The cold air intake at the front of the
dryer must not be blocked or
covered. This would hinder a
sufficient intake of cold air for the
heat exchanger.
Do not block the gap between the
bottom of the tumble dryer and the
floor with plinth facings, deep pile
carpet, etc. This would otherwise
hinder a sufficient flow of air to the
tumble dryer.
The hot air that is blown out from the
heat exchanger warms the room air.
Ensure sufficient ventilation of the
room: e.g., open the window. The
drying time will otherwise take longer
(higher energy requirement).
Before moving the tumble dryer
again
A small quantity of condensed water
that remains in the area around the
pump after the drying process can run
out if the dryer is tilted.
Recommendation: Start the Time Dry
program for approx. 1 minute before
transporting the dryer. Any remaining
condensed water will then be fed into
Installation
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Twb120wp

Table of Contents