Download Print this page

GE AEH14 Owner's Manual And Installation Instructions page 9

Advertisement

Available languages

Available languages

WINDOW REQUIREMENTS
1
• These instructions are for a standard double-hung
window. You will need to modify them for other types
of windows.
• All supporting parts must be secured
to firm wood, masonry or metal.
• The electrical outlet must be within reach of the
power cord.
• Follow the dimensions in the table and illustration
for your model.
26"- 41"
(With accordion panels)
STORM WINDOW REQUIREMENTS
2
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep it
from draining properly.
To adjust for this, attach a piece of wood to the sill.
WOOD PIECES
WIDTH: 2"
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine the thickness, place a
piece of wood on the sill to make it 1/2 higher
than the top of the storm window frame or the vinyl
frame.
Attach securely with nails or screws provided by the
installer.
1/2 higher
than storm
window
frame
Storm window
frame
Installation Instructions
18 1/2"
1/2 higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
PREPARE THE AIR CONDITIONER
3
Pull down the front panel and remove the filter.
A
Remove the front panel by lifting up at an
angle.
Remove the four front screws. Save them for
B
reinstalling the front housing.
Grasp the lower corners of the grille while
C
pressing in on the case sides with your finger
tips. Pull out to release and lift it up.
NOTE: Do not pull the bottom edge toward you
more than 3 or you may damage the tabs of
the grille.
When the front grille is removed the control
D
panel will still be attached by a harness. Turn
the grille around so you can see the back side
of the grille. Remove the 2 screws to separate
the control panel housing from the grille.
NOTE: Be sure to save these screws. You will
need them later in the installation.
Remove Screws
9

Advertisement

loading

This manual is also suitable for:

Aeh18