Viessmann Vitodens 100-W B1HA 26 Installation And Service Instructions Manual page 4

Wall-mounted, gas-fired condensing boiler
Hide thumbs Also See for Vitodens 100-W B1HA 26:
Table of Contents

Advertisement

Table of Contents
4
Vitodens 100-W, B1HA/B1KA 26 to 125 Combi Installation/Service
Necessary Tools ......................................................43
Testing/analysis equipment .....................................43
Overview of Controls and Indicators ...........................43
Control and display elements ................................ 43
Check Power Supply Connection ................................43
Setup Menu Overview ..............................................44
Select Appropriate Gas Type .....................................46
Converting Gas Type ...............................................46
High Altitude Setting ................................................49
Setting Required Heating Input ...................................49
Configuring DHW Tank Sensor Input ..........................50
Setting the DHW Comfort Function ..........................50
Clock Natural Gas Meter ...........................................51
for Leaks .................................................................51
Perform Combustion Analysis ....................................51
Check Venting System for Leaks ................................52
Removing the front Panel ..........................................52
Removing the Burner ................................................53
Reinstall the Burner Assembly ....................................53
Check Neutralization Unit ..........................................55
Check Function of Safety Valves ................................56
Check Gas Pipes and Fittings for Leaks .........................56
Install Burner ...........................................................57
Reinstall Front Panel .................................................57
Cleaning the DHW Heat Exchanger .............................57
Troubleshooting Steps .............................................59
Changing Room Temperature .................................. 59
Diagnosis ........................................................... 60
Calling Up Fault History ............................................ 62
Boiler Connection .................................................... 63
Technical Data .........................................................71
Burner Program Sequence of Operation .......................75
B1HA 26, 35, 94, 125 Wiring Diagram .......................77
B1KA 35, 125 Wiring Diagram ...................................78
Parts List ................................................................79
Installation Fittings ...................................................90
Maintenance Record .................................................91
Lighting and Operating Instructions .............................92
Content/Relay Tests .......................48
2
Page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents