Installation / Operation Instructions Ownership; Required Tools; Uncrating - True GDM-06-LD Installation Manual

Freezer / refrigerator (swing and slide door)
Table of Contents

Advertisement

True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
OWNERSHIP
To ensure that your unit works properly from the first day, it
must be installed properly. We highly recommend a trained
refrigeration mechanic and electrician install your TRUE
equipment. The cost of a professional installation is money
well spent.

REQUIRED TOOLS

• Adjustable Wrench
• Phillips Head Screwdriver
• Level

UNCRATING

The following procedure is recommended for uncrating the
unit:
A. Remove the outer packaging, (cardboard and bubbles or
styrofoam corners and clear plastic). Inspect for concealed
damage. Again, immediately file a claim with the freight
carrier if there is damage.
B. Move your unit as close to the final location as possible
before removing the wooden skid.
C. Remove door bracket on swinging glass door models (see
image 1-2). Sliding glass door models contain shipping
blocks (three for each door). Remove the two styrofoam
blocks taped to the top of the door tracks (see image 3).
1
4
5
INSTALLATION / OPERATION INSTRUCTIONS
2
5
............ www.truemfg.com ............
Before you start to install your TRUE unit, carefully inspect it
for freight damage. If damage is discovered, immediately file a
claim with the delivery freight carrier.
TRUE is not responsible for damage incurred during shipment.
The shipping blocks are orange in color and by opening
the door a little the blocks can be removed (see images
4-6). Do not throw the bracket or blocks away. For future
cabinet movement the bracket and blocks will need to be
installed so the glass door does not receive any damage.
(See image for bracket and shipping block removal)
NOTE
Keys for coolers with door locks are located in warranty packets.
3
6
5

Advertisement

Table of Contents
loading

Table of Contents