Download Print this page

Maintenance; Warranty - Amtrol WELL-X-TROL WX-350 Installation & Operation Instructions

Residential pre-pressurized well tanks

Advertisement

Start Up
Fine Tuning Procedures
1. Restore power and pressurize system until pump cuts off.
2. Open one or more fixtures to reduce pressure and initiate a
pump cycle.
3. Check operation. Make adjustments only when the tank is
empty of water and the system is off.
Figure 2
1400 Division Road, West Warwick, RI USA 02893
T: 800.426.8765 www.amtrol.com
© 2019 Worthington Industries, Inc.
Pressure Adjustment:
• Clockwise to increase
cut-out pressure.
• Counter-clockise to decrease
cut-out pressure.
Adjusting Precharge After Installation
Step 1. Drain tank of all water. Check precharge pressure in the
Well-X-Trol Tank.
Step 2. Release or add air as necessary to set the precharge
pressure 2 psig below the pressure switch pump cut-in setting.

Maintenance

A licensed professional should check the complete system,
including the Well-X-Trol, yearly and more frequently as the
system ages.

Warranty

WX Models: Seven (7) Year Limited Warranty
Visit www.amtrol.com for complete warranty details and to
register the serial number of your well tank.
Part #: 9015-868 MC10185 (09/19)

Advertisement

loading

This manual is also suitable for:

Well-x-trol wx-103Well-x-trol wx-104Well-x-trol wx-200Well-x-trol wx-201Well-x-trol wx-203Well-x-trol wx-205 ... Show all