Service Procedure V: Blower Testing And Replacement - Bradford White UCG100H3993N Service Manual

Ultra low nox atmospheric vent water heaters with direct spark ignition
Table of Contents

Advertisement

Does blower energize?
Ensure control display
shows "Heating." Raise
temperature setpoint if
necessary.
N
Is there 120VAC across
the white and black
wires at the incoming
power harness
connection (see photo
at right)?
Call for
Y
technical
support.
Y
Refer to ignition
module/control board
illustration. Is there 24VAC
between blue and yellow
wires at location J8?
Y
Is there 120VAC
across white and
black wires at the
blower? (See
photo at right.)
Y
Replace blower. (See
"Blower Replacement
Procedure".)
28
Service Procedure V:
Blower Testing and Replacement
Is collector high limit
switch in normally closed
Y
position?
N
Determine
power
N
source
problem
and
correct
Is blower wheel
Y
secured to blower
motor shaft?
N
Replace blower. (See
"Blower Replacement
Procedure".)
Is collector high limit
N
switch in normally
closed position?
Correct safety circuit
problem per safety
circuit trace. (See
Blocked Vent Pressure
Switch Testing".)
N
Repair/replace wire
harness.
Refer to ignition
module/control board
Y
illustration. Is there
24VAC between blue
and yellow wires at
location J8.
Y
120 VAC
power
connection
Check amp draw
through BLACK wire
lead of blower motor. Is
there .6 to 3.0 amps?
N
Black wire
leading to
blower looped
through amp
probe
Replace ignition
Y
module/control
board.
N
28
N
Replace ignition
module/control board.
120 VAC check
at blower

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents