Section 6 - Electrical Connections; Generator Connections; Control Wiring - Honeywell G0062790 Installation Manuallines

50 hz air-cooled generators
Table of Contents

Advertisement

Figure 5.7 — Typical LP Vapor Installation
After completing GAS REQUIREMENTS/CONNECTIONS/FUEL
SECTION 6 — ELECTRICAL CONNECTIONS
Electrical Connections
Section 6
NOTE: A listed branch circuit protector must be installed at least 25 feet from the output connections of the unit.

6.1 GENERATOR CONNECTIONS

NOTE: Control wiring may be already wired on pre-wired generators. If not, wiring must be in accordance with local jurisdiction and codes.
1. Remove the appropriate Main AC/Control Wiring Knock-out Plug from the back of the generator.
2. Install the conduit and Main AC and Control Wires between the generator and the transfer switch. See Figure 2.6 for knockout locations (verify
specific transfer switch wiring/connections per model).
NOTE: These wiring connections may be present on pre-wired models.
NOTE: This wiring can be run in the same conduit if the appropriate insulation rated wire is used or use the provided sleeve to separate
the high and low voltage control wires.
3. Seal the conduit at the generator and in compliance with any codes.
4. Strip the insulation from the ends of the wires. Do not remove excessive insulation.
5. To connect the control wires, push down on the spring loaded connection point with a flat head screwdriver, insert wire and release.
NOTE: No wire insulation should be in the connection point, only bare wire.

6.2 CONTROL WIRING

Control Wire Recommended Length and Size
Maximum Wire Length
1-35 m (1-115 ft)
36-56 m (116-185 ft)
57-89 m (186-295 ft)
90-140 m (296-460 ft)
20
LP - Megajoules = Cubic meters/hour X 93.15
CONVERSION, it's time for
Recommended Wire Size
No. 18 AWG
No. 16 AWG
No. 14 AWG
No. 12 AWG
BEST PRACTICE SPECIFIED BY THE REGULATOR
MANUFACTURER OR REQUIRED BY CODE
MANUAL SHUT
OFF VALVES
FUEL PRESSURE
19-22mm Hg (10-12 in. w.c.)
TRAP
BTU = Cubic feet/hour X 2500
PRIMARY REGULATOR
(SUPPLIED BY INSTALLING
CONTRACTOR)
Step 5
:

Advertisement

Table of Contents
loading

Table of Contents