Panasonic NN-P295 Service Manual page 13

Table of Contents

Advertisement

RATED OUTPUT
1100W
1200W
3. PROCEDURE FOR MEASURING MICROWAVE
ENERGY LEAKAGE
Check for radiation leakage after every servicing.
Should the leakage be more than 2 mW/cm
cm
for Canada) inform PASC, PSC, or PCI
2
immediately. After repairing or replacing any
radiation safety device, keep a written record for
future reference, as required by D.H.H.S. and Health
and Welfare Canada regulation. This requirement
must be strictly observed. In addition, the leakage
reading must be recorded on the service repair
ticket while in the customer's home.
NOTE:
The U.S. Government standard is 5 mW/cm
home. 2mW/cm
cm
for Canada)
2
3.1. Equipment
- Electromagnatic radiation monitor
- Glass thermometer 212°F or 100°C
- 600cc glass beaker
3.2. Procedure for measuring radiation leakage
Note before measuring.
- Do not exceed meter full scale deflection. Leakage monitor should
initially be set to the highest scale.
- To prevent false readings the test probe should be held by the grip
portion of the handle only and moved along the shaded area in
Figure no faster than 1 inch/sec (2.5cm/sec).
- Leakage with the outer panel removed ...... less than 5mW/cm
- Leakage for a fully assembled oven with door normally closed ......
less than 2mW/cm
- Leakage for a fully assembled oven [Before the latch switch
(primary) is interrupted] while pulling the door ...... less than 2mW/
cm
.
2
TEMPERATURE RISE
Min. 16.9°F(9.4°C)
Min. 18.5°F(10.3°C)
WARNING
stated here is our own voluntary standard. (1mW/
2
(1mW/cm
2
(1mW/
2
2
for Canada).
2
13
while in the customer's
.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents